Groundwork & Base
Marking out, membrane down, and the concrete base laid and levelled — the reference point for everything built on top of it.
Featured Project
The brief was simple: a solid, insulated, modern garden office. From there it was down to me — no architect, no separate contractors, from the first stake in the ground to the final board of cladding. It's the clearest example I can show of what's possible when a job's planned properly before the first tool comes out.
The Build
Six stages, start to finish.
Marking out, membrane down, and the concrete base laid and levelled — the reference point for everything built on top of it.
Insulated floor joists go down first, then the wall and roof panels are lifted into place, one at a time.
Framing, walls and roof closed in — the shape of the room fully formed before the weather can get at it.
Windows and doors fitted and the roof made weathertight — the point it stops being a frame and starts being a room.
Insulation and plasterboard go in — the unglamorous middle stretch that makes the room actually usable.
Timber cladding, trim and final details — the last stage before it's ready to move a desk into.